Exploitation of Amberd-1 small HEP
In Aragatsotn region in the neighborhood of Orgov over the Ampur and Amberd rivers small hydroelectric power plants are being constructed. Soon Amberd 1, 2 and then 3 will be given for exploitation. The program is being implemented by “Amberd HEP” CJSC and the German EnBW Trading GmbH.
As the “Amberd HEP” CJSC informed to Aysor.am that “Amberd HEP 1” was to be given for exploitation on April 2009, Amderd 2 on August, and Amberd 3 on April 2010, but because of the financial economic crises the construction processes have been kept back a little.
The general power of the project is 11.54mVt. The project consists of 3 degrees of HEP. The power of the first station is 2.4mVT, the second one’s 4.27mVT, and the third one is 4.87mVt. As a result of implementation of the project the produced energy will be sold to the “Armenian Power Plant”.
The authors of the project assert that the exploitation of Amberd HEP will not have bad influence over the quality of the river's water and the quality of the people living around.
13.11.2009, 11:55
Aysor.am
17:17 • 09/02, Hungary’s Ambassador to Azerbaijan robbed of mobile phone
16:58 • 09/02, G. Amalyan:“What wouldn’t we want for our children to watch?”
16:35 • 09/02, ‘US will recognize Genocide after renouncing Bush’s strategy'
16:08 • 09/02, The speech of Aliev criticized in Azerbaijan
15:58 • 09/02, Ringo Starr gets star on the Hollywood Walk of Fame
15:38 • 09/02, Bako Sahakian hosts Director of Armenia’s “Save the Children”
15:26 • 09/02, S. Safaryan: “April 24 is not a deadline”
15:07 • 09/02, Lys Assia to be present at Eva Rivas’s performance
14:28 • 09/02, Dedicated to Vahan Terian book to be presented
13:48 • 09/02, Michael Jackson's personal physician pleads not guilty
Home